Open App →
Back to News Feed
Tom's Hardware September 6, 2026 By Mark Tyson neutral

Bitcoin mining data center condemned after leaking 3 million gallons of water and forcing school closures — facility operated for years under a city stop-work order

Data Center
A Bitcoin mining data center in El Reno, Oklahoma has been condemned after it leaked 3 million gallons of water.
Read original article ↗

Related Articles

FSP Mega GM 1200W power supply review: An in-house FSP platform that quietly overshoots its own Gold label

The FSP Mega GM 1200W power supply features Platinum-grade efficiency, an all-Japanese capacitor set, and a compact foot

Tom's Hardware · September 6, 2026

The Fairphone 6 Plus is the midrange phone we desperately needed

Repairability rules. The Fairphone 6 Plus feels like an extremely average midrange Android phone and I couldn't be mor

The Verge · September 6, 2026

MSI MEG CoreLiquid E15 360 AIO Review: Bold and stunning, with market-leading performance

MSI’s MEG CoreLiquid E15 360 AIO is a luxury cooling product, with a stunning 6.7-inch screen and industry-leading therm

Tom's Hardware · September 6, 2026

Sales of CD and vinyl music sees strong resurgence amid physical media backlash — US sales of ‘retro media’ were up 59% and 18%, respectively, in H1 2026

Music industry physical revenues jumped by 25.9% in H1 2026, 'powered by 17.7% vinyl growth and a 58.6% increase in CDs,

Tom's Hardware · September 6, 2026