Open App →
Back to News Feed
Digitimes October 15, 2026 By Lily Hess neutral

Taiwan suppliers target OCP power, cooling, 1.6T integration

AI / LLMData Center
The Open Compute Project (OCP) Global Summit 2026 recently took place in San Jose, California, as Taiwan suppliers joined the global AI infrastructure race with offerings spanning power systems, servers, connectors, networking, and optical communications. The event highlighted a shift from standalone server performance to integrated systems focused on 800VDC power, liquid cooling, and 1.6T networking.
Read original article ↗

Related Articles

Taihan Cable wins $89 mil. HVAC system order in US

Taihan Cable & Solution, Korea's second-largest cable maker, said Thursday it has secured a 120 billion-won ($89 million

Korea Times · October 15, 2026

Ricursive Intelligence is betting on AI-designed chips to help solve the compute crisis

The founders detailed how their startup is developing AI that can design chips, learn from each iteration, and improve s

TechCrunch AI · October 15, 2026

AI’s $9-Trillion Question

The AI boom has created insatiable demand for high-performance computing, driving up the cost on everything from GPUs an

HPC Wire · October 15, 2026

Lite-On unveils 800 VDC power and liquid cooling for AI data centers

Lite-On Technology is showcasing an 800 VDC power architecture, NVIDIA Vera Rubin-compatible power racks and integrated

Digitimes · October 15, 2026