Back to News Feed
The Verge
November 16, 2026
neutral
Big Nuclear isn’t worried about the Democrats stopping data centers
MetaAI / LLMData Center
<figure>
<img alt="" data-caption="Constellation's Clinton Clean Energy Center’s single nuclear reactor power plant, July 25, 2025 in Clinton, Illinois. Meta signed a 20-year power purchase agreement with Constellation for the output from the plant. | Image: Getty Images" data-portal-copyright="Image: Getty Images" data-has-syndication-rights="1" src="https://platform.theverge.com/wp-content/uploads/sites/2/2026/11/gettyimages-2227026671.jpg?quality=90&strip=all&crop=0,0,100,100" />
<figcaption>
Constellation's Clinton Clean Energy Center’s single nuclear reactor power plant, July 25, 2025 in Clinton, Illinois. Meta signed a 20-year power purchase agreement with Constellation for the output from the plant. | Image: Getty Images </figcaption>
</figure>
<p class="wp-block-paragraph">Constellation Energy - America's largest operator of nuclear power plants - does not share Wall Street's concerns that the Democrats will slow down data center development. On the company's third-quarter earnings call last week, CEO Joe Dominguez was, for lack of a better word, unbothered as he addressed the blue wave.</p>
<p class="wp-block-paragraph">"I do think we've seen a bit of an overreaction in the market to the election results based upon fear that Democrats won't let data centers get built," Dominguez said.</p>
<p class="wp-block-paragraph">Many of the Democrats who seized control of the House and Senate in this month's midterm elections ran on anti-data-center campaigns, which triggered a <a href="https://www.wsj.com/finance/stocks/wall-street-gets-2-5-trillion-ai-reality-check-with-historic-rout-of-tech-stocks-93985d7c?eafs_enabled=false">histor …</a></p>
<p><a href="https://www.theverge.com/science/1034694/nuclear-energy-constellation-earnings-data-centers-democrats">Read the full story at The Verge.</a></p>
Read original article ↗