Open App →
Back to News Feed
Digitimes August 28, 2026 By Yunnie Cheng negative

Exclusive: IC design faces wire bonding bottleneck in 2027

TSMCAI / LLMSemiconductorsManufacturingSupply ChainData Center
Surging AI chip demand continues to outstrip TSMC's advanced packaging capacity. At the same time, massive AI server shipments are driving up demand for CPUs, networking equipment, power management ICs (PMICs), and peripheral silicon, rapidly soaking up traditional packaging capacity. IC design insiders reveal that several outsourced semiconductor assembly and test (OSAT) providers have already warned clients that traditional packaging capacity could face a deficit exceeding 20% by 2027. New capacity cannot be added quickly enough, with the supply of wire bonding equipment emerging as the primary bottleneck.
Read original article ↗

Related Articles

Samsung diverges from TSMC on FOPLP: retains 415×510mm panel size, targets 2028 mass production

Samsung Electronics' packaging technology lead, Lee Hee-seok, outlined the company's advanced semiconductor packaging ro

Digitimes · August 28, 2026

Google, MediaTek embrace advanced packaging diversification

Google and MediaTek are moving toward advanced packaging diversification, as Intel's embedded multi-die interconnect bri

Digitimes · August 27, 2026

Hot Chips 2026: d-Matrix stacks AI accelerator directly on custom DRAM for 100 TB/s per card — TSMC 4nm compute die bonded face-to-face at a 36-micron pitch on top of a custom-designed die

d-Matrix presented Raptor, which it calls the first 3D DRAM accelerator for generative inference, showing a TSMC 4nm com

Tom's Hardware · August 26, 2026

TSMC packaging shift could boost AMD CoWoS share and trim Nvidia's allocation

Morgan Stanley said TSMC's advanced packaging allocation is expected to shift in 2027, as processor demand tied to agent

Digitimes · August 26, 2026